Sunday, 15 March 2015
Weekly Production 8
This week me, Yanick and Darren (my group) almost finished our music video for our media production. It took us almost the whole of the half term to film it, 2 weeks of editing and almost 9 weekly productions (this is the eighth one) but it was worth it because if we only had one week I don't if we'd of finished it. This week I contributed the same way I always contribute....adding and saying some of my ideas, taping out the beats in the song and editing some of the scenes in the music video. Another way I contributed this week when I was checking when the scenes needed cutting and if the lip syncing was on point with song in the music video...This fits in with the production because...well...as I said many times in these weekly productions this is going to be happening in the music video...this also fits in with my job role from tapping the beats because well...I said this before or something similar to this but every time the beat drops, the scene cuts...so when the scene cuts it adds a jump in the video and that's...how it fits in with the production. Did we have any problems...well...to honest we didn't have any problems this week, and it's funny because out of the days of filming, the 2 weeks of editing and 8 weekly productions...this is the first time this week we never had a problem with the filming or the editing, or if we did then the problem with the media production would still be the lip-syncing because like I said in the last weekly production it's either not on point with the song or comes in at the wrong timing apart from that what are our plans for the following of next week...well...to honest...I guess we would be either continuing and maybe finishing of our media production as soon as we finish that...well...I don't what our plans we'll be planning to do after that...guess we're going to have to wait until then.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment