Friday, 6 March 2015

weekly production 7





This week me and my media group (Yanick and Darren) continued editing the our music video for our media production we filmed over the half term. I contributed this week because my job role (besides editing the music video) was to tap out the beats of the song we were using for our music video, only this time instead of tapping the beats on the table, I was tapping the space bar on the i mac so my group (Yanick and Darren) know then edit and cut out the scene we shot. This also fits in with my contribution because this is my job role for my group as well. This fits in with the production schedule because...well... like I said in the weekly production 6 this was going to be happening in the music video that we happen to be still editing. The only problem we (our group) had during the week, we were editing our music video was just that the lip-syncing in the music video is off and still needs more work because when it comes on, the lip-syncing either looks like it's to fast or  comes on screen at the wrong timing of the song. This problem also affects me as well because the way I see it...it just looks...well...amateur...and I also fear that if we don't edit it properly before the dead line then it well just look wrong and...well to be honest I don't know how else to describe it but besides from that the editing coming along nicely and (the pieces are)slowly coming together. From what I know the end line for our music video production is next week (13th of March) So I guess my plans for the rest of next week is to continue editing group music video production.  

No comments:

Post a Comment